【摘要】 摘要:讨论了离散元法的理论基础及离散元模型分类与特点。针对煤矿开采中的采空区围岩冒落、破裂、变形现象,用UDEC4.0软件对桃园矿煤层采动后F2断层附近位移变化量和应力分布进行数值计算,并利用其模拟结果对F2断层煤柱留设宽度适合性进行了深入研究。主要内容有:①分析了煤系地层与相关含水层的含水-隔水性质,对F2断层带的物质组成与物理力学性质进行了评价分析。②采用规程中公式,计算出对应于不同安全系数的10煤与81煤的断层防水煤柱留设宽度。采用基于Mohr—Coulumb本构连续介质与Joint area contact—coulomb slip with residual strength节理介质的离散元本构模型,针对桃园煤矿地层及F2断层实际,模拟了10煤和81煤各种煤柱留设条件下的煤层采动围岩变形破坏特性,研究了断层防水煤柱宽度和采厚的非线性关系,给出了10煤和81煤煤柱宽度的合理值。③对断层防水煤柱公式实用中的缺陷进行了深入分析,指出公式的力学涵义与应用特点,指出公式中煤柱宽度与煤层采厚线性关系的不合理性,以及与“三下”理论及裂隙发育实际规律间的矛盾性。④对岩层移动角引入防水煤柱留设计算的适用条件与缺陷也进行了探讨。
【Abstract】 Not only the theoretical basis of Discrete Element Method (DEM) but also the classification and characteristics of DEM were discussed. For coal mining in the mined-out area surrounding rock caving, cracking, deformation phenomena, UDEC4.0 software was used in the numerical calculation to the distribution of displacements and stresses surrouding mining goaves of seam 10# and seam 81 about fault F2 in Taoyuan Coal Mine, and proper width of waterproof pillar to the fault. Main contents are:①Water-bearing and water-resisting features of Coal-bearing beds and related strata were analyzed. Evaluation and analysis about the material composition and physics mechanics of the fault F2 were analyzed.②Order formula was used to calculate the width of waterproof pillar of seams 10# coal and 81# corresponding to different safety factor. Based on Tectonic model of DEM about Mohr-Coulumb Constitutive continuous medium and Joint area contact-coulomb slip with residual strength joints media, referring to Taoyuan Coal Mine Stratigraphy and fault F2, a variety of coal pillars of seam 10# and seam 81# under the conditions of deformation and failure characteristics of rocks were simulated, and non-linear relationship between the fault waterproof pillar width and thickness of the seams was researched, and the reasonable value of coal pillar width about seam 10# and seam 81# is also tried.③By a in-depth analysis to practical deficiencies of fault waterproof pillar formula in the professional regulation, the mechanics meaning and application characteristics of the formula, the irrationality of a linear relationship between seam thickness and pillar width, as well as the contradiction between that and the actual laws of fractured, were pointed out lacement angle theory was led to analyze the applicable conditions and defects of the design calculation on water-proof pillar to faults.
【Key words】 Discrete Element Method (DEM); Fault; water-proof pillar; mining-induced fracture;
- 【网络出版投稿人】 合肥工业大学 【网络出版年期】2011年 05期
- 【分类号】TD823;TD32
- 【被引频次】5
- 【下载频次】324