节点文献
深覆盖层上建土石坝研究与实践
Research and Practice about Building Earth-Rock Dams on Deep Overburden Layer
【摘要】 深覆盖层上建土石坝已成为一种趋势,依据国内外具体的工程实例,总结归纳了深覆盖层上建土石坝存在的主要问题,并就渗漏和渗透稳定问题作了具体的分析.对于混凝土防渗墙防渗形式,应用了Fortran语言编制的饱和土二维渗流分析程序进行了渗流计算,计算结果表明其防渗效果良好.
【Abstract】 It has been becoming a trend to build earth-rock dams on deep overburden layer.This paper summarizes the main current problems about the construction of earth-rock dams on deep overburden layer through some specific engineering practices at home and abroad;and then it analyzes the stability problems caused by leakage and infiltration in detail.This paper also conducts the seepage calculation for the concrete cutoff wall by using 2-dimensional saturated soil seepage analysis program compiled by Fortran.The seepage calculation results show that the concrete cutoff wall has good anti-seepage effectiveness.
【Key words】 deep overberden layer; earth-rock dams; stability of leakage and infiltration; concrete cutoff wall; finite elements;
- 【文献出处】 三峡大学学报(自然科学版) ,Journal of China Three Gorges University(Natural Sciences) , 编辑部邮箱 ,2012年03期
- 【分类号】TV641
- 【被引频次】1
- 【下载频次】64