节点文献
滕州站铁路货场搬迁方案研究
A Study on the Relocation Plan of the Freight Yard at the Tengzhou Railway Station
【摘要】 为改善城市中心交通环境,解决既有铁路货场与城市发展规划的矛盾,促进城市及铁路货运的协调发展,概述滕州站铁路货场发展现状,在综合考虑满足城市发展及铁路运输需求的基础上,从城市总体规划、产业规划、交通规划、土地利用规划、接轨站改建条件等多方面比选确定搬迁至界河站接轨方案,进一步从运输组织、运营管理、公铁联运、工程建设条件及预留发展等多方面分析,综合比选推荐鲁南中联水泥有限公司专用铁路工厂站扩建货场方案,为城市中心铁路货场搬迁方案提供参考。
【Abstract】 To improve the traffic conditions in the city center, address the contradiction between the railway freight yard and the urban development planning and facilitate coordination between urban construction and railway freight transportation development, this paper has studied the conditions of the railway freight yard at the Tengzhou station and the requirements of the urban development and railway transportation in a comprehensive way. From the aspects of the overall urban planning, industry planning, transport planning, land-use planning and the conditions for the reconstruction of the connection station, this paper has compared and recommended the plan to relocate the freight yard to the Jiehe Station. Accordingly, taking into consideration the factors in terms of transportation organization, business management, rail-road intermodal transport, construction conditions and development conditions, this paper has also recommended the reconstruction plan at the station of the railway exclusive for China United(Lunan) Cement Co., Ltd., which is expected to serve as reference.
【Key words】 Railway; Location Selection of Connection Station; Location Selection of Freight Yard; Plan Comparison and Selection; Transport Organization;
- 【文献出处】 铁道货运 ,Railway Freight Transport , 编辑部邮箱 ,2019年10期
- 【分类号】U291.52
- 【网络出版时间】2019-10-23 16:56
- 【下载频次】69