节点文献

660MW机组超临界锅炉间全封闭受热面的吊装方法

Hoisting method of heating surface for 660 MW supercritical boiler in whole closed boiler room

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王晓利刘东民

【Author】 WANG Xiaoli,LIU Dongmin(Heilongjiang No.3 Thermal Power Construction Corporation,Harbin 150016,China)

【机构】 黑龙江省火电第三工程公司

【摘要】 分析了660 MW机组超临界锅炉跨冬施工中存在的问题,以九台电厂#1机组锅炉间全封闭条件下受热面的吊装方案为例,论述了锅炉在全封闭情况下受热面的吊装措施。

【Abstract】 The problems existing in winter construction of 660 MW supercritical boiler were analyzed.Taking the heating surface hoisting scheme of the boiler No.1 in Jiutai Power Plant under the condition of whole closed boiler room as example,the boiler heating surface hoisting measures under the condition of whole closed boiler room were expounded.

  • 【文献出处】 华电技术 ,Huadian Technology , 编辑部邮箱 ,2012年03期
  • 【分类号】TK226
  • 【被引频次】1
  • 【下载频次】23
节点文献中: