节点文献

紫坪铺水利枢纽工程引水发电系统震后安全性复核简析

Analysis on post-earthquake safety check for water diversion and power generation system of Zipingpu Water Control Project

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 由丽华

【Author】 YOU Lihua(Sichuan Zipingpu Development Co.,Ltd.,Chengdu 610091,Sichuan,China)

【机构】 四川省紫坪铺开发有限责任公司

【摘要】 "5.12"汶川地震中,紫坪铺大坝经受住了8级强震考验。本文通过对该工程引水发电系统按照新设防标准下的地震荷载分别进行静态和动态应力分析计算及对计算结果进行分析,提出灾后重建补强或加固方案。希望紫坪铺引水发电系统震后安全性复核的结果,对今后水工发电建筑物的抗震设防有所启示和裨益。

【Abstract】 During "5·12" Wenchuan Earthquake,the dam of Zipingpu Water Control Project withstood the Ms8.0 super-strong earthquake.A post-earthquake reinforcement or strengthening scheme is put forward herein in accordance with the static and dynamic stress analyses respectively made on the relevant seismic loading under the new seismic fortification criterion for the water diversion and power generation system of the project and the calculation results from the analyses.It is expected that the result from the post-earthquake safety check for water diversion and power generation system of Zipingpu can provides some references and benefits to the seismic fortification of the similar hydropower structures in the days to come.

  • 【文献出处】 水利水电技术 ,Water Resources and Hydropower Engineering , 编辑部邮箱 ,2011年04期
  • 【分类号】TV698.2
  • 【下载频次】42
节点文献中: