黑河水库右岸溢洪洞左导墙修改试验总结
Mending Left Guide Wall of Spillway Hole in the Right Bank of the Heihe River Reservoir
【摘要】 黑河水利枢纽在设计与施工过程中基础开挖量较大,增加了工程投资。为减少投资,降低施工难度,缩短工期,经试验优化与论证,为实际工程推荐方案。
【Abstract】 The Heihe River project’s excavation volume is huge from the original wing wall design for the right-bank spillway tunnel,which in- creased investment.A modified the design work is recommended in order to make the construction easier and quicker due to an additional labora- tory experiment.