节点文献
备件库现浇排架柱结构施工
Bent-column Framework Construction of Concrete Pouring On-site for Spare Parts Warehouse
【摘要】 马钢某总厂的备件库为现浇单层排架结构。着重介绍了该备件库在施工现浇排架柱时所采取的技术措施及注意事项。
【Abstract】 The spare parts warehouse of Masteel some General Plant is single layer bent-column framework construction of concrete pouring on-site.This paper introduces the technical measures and precautions during pouring into concrete for bent-columns of this spare parts warehouse.
- 【文献出处】 安徽冶金科技职业学院学报 ,Journal of Anhui Vocational College of Metallurgy and Technology , 编辑部邮箱 ,2009年04期
- 【分类号】TU755.6
- 【下载频次】19