嵩厦220kV送电线路海上N9铁塔冲(钻)孔桩施工技术
The construction technique of impact (boring) piles for N9 iron tower on the sea of Song-Xia 220kV line of power transmission
【摘要】 论述嵩厦 2 2 0kV送电线路海上N9铁塔若干重要环节施工问题 ,对同类工程施工提出几点建议
【Abstract】 To illustrate some important steps in construction for N9 iron tower on the sea of Song xia 220kV line of power transmission,then put forward some suggestions to analogous projects.
【关键词】 海上大型铁塔;
冲(钻)孔灌注桩;
施工平台搭设;
护筒定位、下沉;
成孔嵌岩;
清孔;
桩身砼灌筑施工;
【Key words】 large iron tower on the sea; cast-in-situ piles; platform construction; piles shield location; sinking; boring; embed rock; bore clear; concrete irrigating for piles;