用预应力锚索加固地下硐室的实践
Reinforcement of Underground Room by Prestressed Anchor Cable
【摘要】 梅山铁矿二期破碎硐室处在蚀变严重的闪长玢岩中,岩体有较大的膨胀性。结合硐室开挖步骤,应用了预应力锚索进行初始支护、局部加固支护和最终的加强支护。通过现场监测和数值计算,判断支护后的硐室处在稳定状态。
【Abstract】 The second phase engineering of crusher room in Meishan Iron Mine is situated in serious alteration diorite-porphyrite with larger expansive feature. In the room excavating,the prestressedanchor cable is used as initial support,partly reinforced support and finally reinforced support. Based onthe in-situ monitoring and numerical value calculating,it is enough to prove the room of support beingstable.
【关键词】 地下硐室;
预应力锚索;
加固支护;
稳定性;
【Key words】 Underground room; Prestressed anchor cable; Reinforced support; Stability;
【Key words】 Underground room; Prestressed anchor cable; Reinforced support; Stability;
- 【文献出处】 金属矿山 ,METAL MINE , 编辑部邮箱 ,1996年07期
- 【分类号】TD264.3
- 【被引频次】10