节点文献

长短SMW工法桩在深厚软土基坑中的应用

Application of Long-Short SMW Pile in Excavation Pit of Deep Soft Soil

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【摘要】 本文结合漳州地区某深厚软土复杂地质工程的基坑工程实践,通过多种基坑支护方案的比选,采用了长短SMW工法桩+预应力扩孔锚索的支护方案。该支护体系利用SMW工法长桩与SMW工法短桩之间的协调作用,实现了基坑支护的安全性与经济性的统一,在一定程度上能避免材料的浪费并缩短工期。

【Abstract】 Based on the foundation pit engineering practice of a deep soft soil complex geological engineering in Zhangzhou area,through the comparison and selection of various foundation pit support schemes,the long and short SMW pile + pre-stressed anchor cable support scheme is adopted.The supporting system makes use of the coordination between SMW long pile and SMW short pile,realizes the unity of safety and economy of foundation pit support,avoids material waste and shortens the construction period to a certain extent.

  • 【文献出处】 福建建设科技 ,Fujian Construction Science & Technology , 编辑部邮箱 ,2019年05期
  • 【分类号】TU753
  • 【被引频次】2
  • 【下载频次】79
节点文献中: