节点文献

剩余零时差对接线连片成图法及其在徐家围子断陷三维连片构造成图中的应用

The method for merging maps with residual zero time-difference jointing line and its application to 3D seismic structural map mergence in Xujiaweizi Faulted Basin

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘锦文刘文龙门广田

【Author】 LIU Jin-wen1,LIU Wen-long2,MEN Guang-tian3(1.Doublefox Software Company Ltd.,Baoding 071051,China;2.Exploration and Development Research Institute of Daqing Oilfield Company Ltd.,Daqing 163712,China;3.Exploration Company of Daqing Oilfield Company Ltd.,Daqing 163453,China)

【机构】 双狐软件有限公司大庆油田有限责任公司勘探开发研究院大庆油田有限责任公司勘探分公司 河北保定071051黑龙江大庆163712黑龙江大庆163453

【摘要】 为消除三维地震工区间时差对连片构造成图的影响,根据地震反射标准层统计、分析资料叠合区t0时差,确定速度联合建场和构造连片成图的平均时差校正方案、方法,再根据剩余时差平面图确定剩余零时差对接线,以消除无规律的剩余时差影响。时差校正最终达到了使资料对接线两侧等t0线落差不超过1个等高距且产状一致性较好,速度场值接近且趋势相同的效果。该方法采取对地震速度谱和地震成图层位(或segy数据体)t0时间进行加减常量式的校正,既能有效地消除工区间的时差,基本实现等t0图和速度场的"无缝"对接,又可避免对接区构造形态和速度场趋势的畸变。为保证时差校正的准确性,方法适用于具有地震反射标准层和一定面积重叠的三维地震资料。

【Abstract】 To eliminate the influence of time difference to merging structural maps between 3D seismic work areas,t0 time difference for data overlapping areas have been calculated and analyzed according to the seismic reflection marker.Then the program and method for the establishment of velocity combination field and the average TEC of structural merging maps will be determined,and the residual zero time difference jointing line will be determined based on the residual time difference flat sheet to eliminate the effect of the irregular residual time difference.The TEC can finally makes the downthrow of t0 lines on both sides of data joints lines less than 1 vertical interval with better occurrence conformity,and the velocity field values are close with the same tendency.According to this method,constant plus and minus correction is applied to seismic velocity spectrum and seismic restitution horizon(or segy data object) at t0 time.This method can not only effectively eliminate the time difference between work areas to get seamless jointing of iso-t0 map and velocity field,but also avoid the distortion of structural attitude and velocity field tendency in jointing area.In order to ensure the accuracy of TEC,it’s better to apply this method to 3D seismic data with seismic reflection marker and certain overlapping area.

  • 【文献出处】 大庆石油地质与开发 ,Petroleum Geology & Oilfield Development in Daqing , 编辑部邮箱 ,2008年02期
  • 【分类号】P631.4
  • 【被引频次】2
  • 【下载频次】51
节点文献中: