大庆采油三厂400万吨原油生产项目绩效管理研究

The Study of Performance Management on 4,000,000 Tons Crude Oils the Project in NO.3 Oil Production Company of Daqing Oilfield

【作者】 王大勇

【导师】 宋玉臣; 陶建文;

【作者基本信息】 吉林大学 , 项目管理, 2010, 硕士

【摘要】 随着全球经济一体化的加速发展,竞争日益激烈,如何保证项目团队活动能够与团队目标保持一致,并且不断提升团队绩效和建设水平,对项目团队进行有效的绩效管理就成为不可缺少的一环。本文紧紧围绕采油三厂400万吨原油生产项目,先从理论上对团队绩效管理和团队绩效管理主要运作模式等进行了探讨,并对国内绩效管理的现状和存在的问题进行了深入的分析。在此基础上,对采油三厂原有绩效管理模式进行分析,指出了在组织结构、绩效管理工作流程和绩效管理体制方面存在的问题。特别是针对采油三厂在实施绩效管理过程中出现的弊端,提出了改进的具体设想。最后,对构建绩效管理体系的基本要求和遵循的基本原则进行研究,导入业绩合同和综合测评考评,并对绩效管理实施障碍及应对策略进行剖析,提出了改进和完善绩效管理的具体建议和措施,从而构建起全员、立体、多角度的绩效管理体系。

【Abstract】 Develops high speed along with our country national economy, our country petroleum consumption quantity and the import volume climbs high year after year only, energy anxious contradictory day by day prominent. In this case, the Daqing Oil Field stands in the maintenance national strategy security political altitude, has formulated 40 millions again stable production ten year strategic target. Of a extraction three factory as Daqing Oil Field Main force Extraction Factories, facing the Daqing Oil Field output pressure, shared on own initiative for the company, proposed yearly produced 4 millions ton crude oils to continue the stable production project. But the third extraction factory undergoes more than 40 years highly effective developments, the oil-field development entered the especially high watery time, The oil field surplus recoverable resources are few, the cost rises year by year, the production and the maintenance work load increase, complete 4 millions ton production project difficulty to be getting bigger and bigger. Regarding 4 millions ton crude oil production project, the Daqing Oil Field third extraction factory comprehensive carrying out team achievements management, layer upon layer transmits the responsibility pressure regarding the enterprise, arouses and stimulates staff’s enthusiasm, guaranteed that the enterprise achieves the year production operation goal, appears more important。This article according to the situation duty which the enterprise internal and external environment and faced, the union enterprise characteristic and the development reality, utilization management theories and the method and so on project management, management by objectives, flow restoration, the analytical study Daqing Oil Field third extraction factory carrying out achievements management existence question, and to take completed the oil gas production task to conduct the research and the exploration as the core business extraction factory implementation achievements management method, made the improvement concrete tentative plan with the plan。The first chapter, first to the team achievements management and theories and so on team achievements management main operation pattern has carried on the discussion, specially has analyzed the overseas achievements management general character characteristic by the example, has pointed out the domestic achievements management existence question and the flaw. At present, overseas is specially the Western developed country, the achievements management, regardless of being the fundamental research, practices is quite mature. In the practice, the overseas enterprise’s achievements management has received management by objectives principle, mainly uses the plan, the appraisal, the feedback, the improvement achievements management flow。Also had many innovations in the achievements management aspect, presented the new achievements management model and the management tool, like the KP labor achievements examination pattern, the BSC balanced product branch customs station management pattern, 360 degree achievements examination pattern and so on, promoted the achievements management level enhancement. The Chinese Enterprise achievements management system construction was still at the initial stage, the achievements management system not yet consummates, the existence goal is not clear about, the system not completely, the system design to lack questions and so on scientific nature, operation insufficient standard.The second chapter, this chapter in fundamental research’s foundation, inducts effectively to the third extraction with the implementation achievements management carries on the elaboration, has analyzed the implementation project achievements management concrete step and the achievements management effect appraisal. At present the third extraction factory implementation achievements management is mainly aims at the leader class administrative personnels, the general management personnel, the professionals and the operation service personnels four kind of different post staffs, determined that the different achievements management content, adopts the different achievements management form. The achievements examination mainly includes the achievement contract examination, the work mission examination and the synthesis evaluation examines and critiques three aspect contents, and aims at the different examination content determination date, the week, the month, the year and so on different examination cycle, the examination strictly carries on according to the stipulated procedure and the standard, adopts the synthesis scoring the means to implement the quantification allocation, and according to examination result, no bluffing.The third chapter, this chapter analytical study third extraction factory organizational structure, project achievements supervisory work flow and project achievements management system question. Specially aims at the third extraction factory to present the achievements management in the implementation achievements management process to lack the system to know that to lack the process communication, the inspection to lack, the inspection result to lack the feedback, the inspection result operationally not to carry out, the monitoring to lack malpractices and so on validity, the analysis made the improvement concrete tentative plan. First, wants the science establishment essential achievement target and the prime task duty inspection project; second, strengthening regular work, key work, temporary duty operational practice inspection; Third, insisted that from the work achievement, the core competencies, individual quality, the work four aspects, to the different stratification plane personnel, according to the different weight, carries on the comprehensive quantification inspection.The fourth chapter, this chapter in elaborated that in the enterprise general goals’ foundation, the basic principle which and follows to the third extraction factory implementation achievements management system construction’s essential requirements conducts the research, and introduced the entropy value law to elaborate the target weight’s determination, as well as carried on the analysis to the achievements management implementation barrier and the dealing with strategy. The implementation achievements management’s basis lies in the guarantee enterprise strategy goal realization. The achievements management system management system’s design must first limit to achieve some kind of goal to individual characteristic is anything, determined that integrates the achievements management the content, then re-engineering corresponding achievements weight and feedback system. As the extraction factory, establishes the achievements management system to insist that with the team goal consistent, the prominent achievement, the responsibilities and rights and benefits consistent, the objective and fair fair public, the lamination classification, the progressive inspection, concise practical, gives dual attention comprehensively, inspects strictly cashes nine principles hardly, simultaneously must aim at extracts oil three factory in implementation achievements management process malpractices, uses the entropy value law determination weight, the enhancement achievements assessment method quantifying degree.Through the research analysis, obtains five understanding: First, the implementation team achievements management will pay great attention the future compared to the pure inspection, will drive compared to the achievements wages arrives, management by objectives, the Total Quality Management connotation will be richer than, the foundation will be more reliable, stamina foot. Second, the enterprise in the team achievements management’s entire process, should take the team goal as the instruction, pays great attention from to achieve the goal the initial stage, how the implementation stage to the feedback stage entire process to the team and the member to carry on the communication and counselling. Third, in the achievements management process, must insist that take the human this as, molds humanist develops, the widespread participation positively, unites the upward enterprise culture, promoted the superintendent and staff’s communication exchange, the enhancement team’s cohesive force and troop’s battle efficiency. Fourth, in reality, the achievements management needs certainly to act according to the different post the concrete characteristic to draw up the target-oriented inspection means and the standard. Fifth, the team achievements management must have the quantity standard, evaluates staff’s achievement objectively through the quantification inspection; Must have the archery target to demonstrate that arouses staff’s work enthusiasm fully through the rank rewards and punishment. Through carries on the quantification inspection to all levels of units and the staff, fair, accurate, evaluates it effectively to enterprise’s value, and implements the compensation according to amount of work, according to“achievements”assignment, thus the stimulation troop vigor, raises the enterprise combined earnings, the promotion project goal’s real situation is present. Sixth, the staff achievements appraisal is from the system, the relation, the dynamic angle of view, carefully examines the staff achievements question from the enterprise whole management and operation’s angle of view, through enhances staff individual achievements, stressed that continually, the dynamic achievements communication and the achievements feedback, achieves organization’s development targets.

  • 【网络出版投稿人】 吉林大学
  • 【网络出版年期】2010年 09期
  • 【分类号】F272.92;F426.22
  • 【被引频次】1
  • 【下载频次】157
节点文献中: 

本文链接的文献网络图示:

本文的引文网络