节点文献

预应力锚索支护在岩质高边坡工程中的应用及稳定性的有限元分析

Application of Prestressed Anchor in High Rock Slope Engineering and the Finite Element Analysis of Slope Stability

【作者】 张剑

【导师】 陈晨;

【作者基本信息】 吉林大学 , 地质工程, 2009, 硕士

【摘要】 预应力锚固技术在近代岩土工程中得到了广泛的应用,取得了巨大的成功,应用的理论研究也获得了很多的成果,但目前国内对预应力锚索支护的研究尚不足。预应力锚索支护设计还主要依靠工程经验和工程类比法,同时结合规范及相关的岩土类软件进行分析而得,理论研究的落后制约了预应力锚索支护技术的进一步发展,因而对预应力锚索支护做进一步研究具有一定的现实意义。针对目前预应力锚固技术中存在的一些问题,本论文结合长春市玫瑰谷采石场岩质高边坡支护工程,详细的说明了预应力锚索支护结构的参数设计计算。同时采用GeoStudio、ANSYS10.0软件,应用有限元强度折减法对边坡进行稳定性分析,通过数值分析得出结构荷载作用下边坡的位移、变形和塑性区域发展趋势,通过绘制不同强度折减系数下的边坡某一位置位移曲线来定边坡的安全系数。根据分析结果提出自己的观点,为今后同地质条件下预应力锚索支护设计和边坡的稳定性分析提供参考。

【Abstract】 With the rapid development of our national economy, the flourish of modern construction, various large-scale engineering projects have been under construction such as high-rise buildings, water resources and hydropower facilities, mines, ports, highways, railways and energy projects, etc. However, abundant slopes have been inevitably formed during the construction of those projects or during the operation after construction. As a result, analysis of slope stability has become important research content in rock mechanics. However, there are a lot of problems arising in project practices, such as misunderstanding of characteristics and attributes of slope projects, ineffective measures taken in regulation projects. Those problems always result in deformation and destruction of slope projects with serious damages and great loss, or in unnecessary waste due to over-conservative regulation schemes. Therefore, analysis of slope stability and careful selection of slope regulation schemes are of great importance to satisfy a double goal of safety and economy.First of all, the paper summarizes the developing course and current research status of prestressed cable support, expounds the analysis methods and principles of prestressed cable support, and introduces in detail principles and methods of prestressed cable support structure design and concrete design contents on the basis of previous study of prestressed cable. Furthermore, it expounds matters requiring attention in design calculation and stability analysis and introduces in detail the application of finite element strength reduction method in slope stability analysis by current standard design method, stability checking calculation and finite element strength reduction method.Then combine Changchun City Rose Valley quarry slope management projects, detailed description of the prestressed cable structure parameters of the design process, and selection of Drucker-Prager constitutive model, based on the finite element ANSYS10.0 procedures strength reduction, the natural slope and prestressed cable slope stability checking to determine reasonable prestressed cable programmed. In carrying out finite element analysis, the slope will be for the plane eight discrete node isoperimetric element, the establishment of calculation model using finite element strength reduction through before and after processing, calculation results from the slope of the displacement, and plastic deformation regional trends by drawing within a point of the slope displacement and reduction coefficient curve to determine the relationship between the natural slope and prestressed cable slope safety factor.According to the stability of the simulation analysis, the following conclusions can be drawn:(1)Based on strength reduction finite element method, the way to analyse the slope stability does not need to assume the position of failure plane. And the computational model satisfies the balanced equation of power and stress-strain relationship of rock mass body, can be used to simulate the natural process of excavation, which is traditional limit equilibrium method could not be achieved.(2)Application strength reduction method to analyse the slope stability, can get horizontal displacements of rock mass body under the different reduction factor, and determine the assurance factor by analyzing. (3) According to the normative experience, a reasonable and safe prestressed cable parameter is determined and it satisfies the standards requirements of stiterion.(4)The assurance factor of the supported slope can be obtained by simulation that is beyond 1.70.the stability of rock mass body significantly increase, but the displacement reduce, that is , prestressed cable programme for Rose Valley quarry in Changchun City High Slope Support project is feasible and reasonable.

  • 【网络出版投稿人】 吉林大学
  • 【网络出版年期】2009年 09期
节点文献中: 

本文链接的文献网络图示:

本文的引文网络