对抚顺石油二厂延迟焦化装置扩能改造的探讨

Discussions on Expansion of Delayed Coker Capacity in Refinery No.2 of PetroChina Fushun Petrochemical Company

【作者】 姚春莹

【导师】 孟舒献; 艾英林;

【作者基本信息】 天津大学 , 化学工程, 2008, 硕士

【摘要】 世界范围内原油重质化和劣质化速度加快,而对轻质油产品的需求量增大,延迟焦化技术因其设备投资少、工艺简单和技术成熟等特点,日益受到重视,成为近年来一个新的研究热点和重要的重油加工手段。到目前为止,延迟焦化工艺无论从流程、设备的材质选择还是设备的大型化方面都有了突飞猛进的发展,变得更加经济合理,节省了投资。预计到2008年底,抚顺石化公司石油二厂原油加工总量将增加到1150万吨/年。根据总流程的要求,焦化装置需要加工处理大约280万吨/年的减压渣油,因此现有的120万吨/年处理能力的焦化装置需要扩能改造至280万吨/年,以满足全厂重油平衡的要求,同时满足为百万吨乙烯技改工程提供优质乙烯裂解原料和“油蜡联产”技改工程提供充足的生产石蜡及润滑油基础油的理想原料。本文主要任务是梳理出抚顺石化公司石油二厂280万吨/年延迟焦化扩能改造的瓶颈,选择适合现场实际情况的最优的改造方案,确定合理的操作参数和工艺流程,以最少的投资创造最大的经济效益。同时也对装置工程设计中的自动控制水平、环保与安全问题以及装置建设的可行性进行经济分析。

【Abstract】 With the pace of the heavy crude oil and poor crude oil speeding up worldwide and the light quality oil product is demanded largely, so the delayed coker technology is taken seriously day by day and becomes a new research focus and the important heavy oil processing method in recent years owing to less equipment investment ,simple craft and well-developed technology. So far, delayed coker craft has made great development on the aspects of the process, the choice of equipment’s material quality or equipment’s scale, becomes more economical and reasonable, and then has decreased the investment.It is estimated that by the end of 2008,the total sum of the crude oil processing in refinery No.2 of Fushun Petrochemical Company petroleum will have increased to 11,500,000 tons per year. According to the requirement of total process , the coker unit needs to dispose 2,400,000 tons crude pomace oil per year, therefore the existing coker unit with the ability to handle 1,200,000 tons per year needs to be expanded and improved to 2,400,000 tons per year to meet the needs for the heavy oil in the entire factory, simultaneously provides high quality ethylene decomposition raw material for 1,000,000 ton ethylene technological transformation project and provides the sufficient production of paraffin wax and the ideal raw material of the basic oil of the lubricating oil for the technological transformation project of the production of the oil and the paraffin wax.This article talks about the bottleneck of delayed coker technology with 2,400,000 tons per year in Fushun Petrochemical Company , selection of the superior improvement plan which suits the actual situation and the decision of the reasonable operating parameter and the technical process in order to create the maximum economic efficiency by the least investments, at the same time has carried on the economic analysis to the automatic control level of the unit engineering design, the environmental protection and the security problem as well as the feasibility of the equipment construction.

【关键词】 延迟焦化装置扩能改造设计方案
【Key words】 delayed coker unitexpanding capacity reformdesignplan
  • 【网络出版投稿人】 天津大学
  • 【网络出版年期】2009年 08期
  • 【分类号】TE966
  • 【被引频次】1
  • 【下载频次】198
节点文献中: 

本文链接的文献网络图示:

本文的引文网络