成灌高速公路运营及其成本分析

On Research of Management and Cost of Chengguan Expressway

【作者】 史有惠

【导师】 杜文;

【作者基本信息】 西南交通大学 , 交通运输工程, 2003, 硕士

【摘要】 随着国民经济持续、快速、健康的发展,我国的高速公路事业进入了一个蓬勃发展的时期,如何对高速公路建设项目进行运营分析,总结高速公路建设与管理的经验,指导今后高速公路建设与管理已经成为一个比较突出的问题。 论文首先介绍了高速公路建设项目后评价的主要作用,它是高速公路基本建设程序的重要组成部分,是管理周期中不可缺少的信息反馈环节,对全面总结项目前期工作,提高高速公路建设项目决策、设计、施工和运营管理水平具有重要的意义,已经成为全面、客观衡量项目前期工作,提高项目效益的重要手段;论文研究了高速公路建设项目后评价的发展现状,分析了后评价工作的意义、基本内容和程序。然后以成灌高速公路为案例,通过大量的调查对成灌高速公路的运营情况、成本费用情况及环境影响进行了分析,并提出了相关建议。论文重点对高速公路建设项目运营情况评价理论方法进行了研究,提出了其所包含的主要内容,研究分析了通行能力和服务水平的计算方法,建立了运营情况评价的指标体系,并初步探讨了运营管理评价。 论文对高速公路建设项目运营及成本分析的理论与方法进行了研究,并结合成灌高速公路进行了分析,对于后评价的理论与方法的不断完善和成灌高速公路的后评价工作具有一定的指导意义。

【Abstract】 With the long-term construction and development of economy of all countries in the world, the expressway has been the symbol of modern society. How to process the assessment of highway construction project, summer experience of highway construction and management, and prefer the work from now on has come to be a protrudent problem.Firstly, the development condition of the post assessment of highway construction project was introduced in this thesis. The signification, basic content, and assessment procedure of the post assessment were analyzed, and the relationship and difference between the post assessment and feasibility research were elaborated. Then the operation management, the cost and the environment effect of Chengguan Expressway were studied, some related proposed was put forward, In this thesis, the post assessment for operation condition and operation management was studied emphatically .The main contents of traffic survey were produced, the calculating methods of capacity and service level were studied and analyzed, and the idex system of the post assessment for operation condition was established.The theory and means post assessment of highway construction project were studied in this thesis, and the post assessment for operation condition of Chengguan Expressway was put up. Studies and practices in this thesis have directive signification to a certain both on the theory and means of post assessment and the post assessment for operation condition of Chengguan Expressway.

  • 【分类号】F542
  • 【被引频次】2
  • 【下载频次】303
节点文献中: 

本文链接的文献网络图示:

本文的引文网络