节点文献
地震灾区某职工住宿楼项目加固设计
The Reinforcement Design for a Workers’ Dormitory Project in the Earthquake-stricken Area
【摘要】 本工程所在区域震感极为强烈,建筑物及生产设施遭受破坏较严重,致使该建筑物出现很多裂缝。文章介绍了粘贴芳玻韧布和混凝土修补2种常见的加固处理方案,指出灵活地运用检测、加固方法,可以取得事半功倍的效果。
【Abstract】 The earthquake could be strongly felt in the place where the project was and brought severe damage to buildings and production equipment,leading to some cracks in the building.This article introduces two basis ways to reinforcement measures,that is the use of paste Fibrwrap and concrete and makes clear that testing and reinforcement can obtain the result of get twice the result with half the effort.
- 【文献出处】 企业科技与发展 ,Enterprise Science and Technology & Development , 编辑部邮箱 ,2009年18期
- 【分类号】TU746.3
- 【下载频次】12