节点文献
中国实验快堆转运-清洗室的力学分析
Numerical Analysis of Transfer and Purge Chamber for China Experimental Fast Reactor
【摘要】 转运-清洗室是中国实验快堆(CEFR)堆外换料系统中的主要设施,为反应堆换料操作提供一个安全可靠的密封和生物屏蔽空间,以保证操作人员的人身安全。本文采用数值方法对其进行力学分析。结果表明:CEFR转运-清洗室的力学性能满足规范要求。
【Abstract】 Transfer and purge chamber of China Experimental Fast Reactor(CEFR) is one of the main facilities of the out-core refueling system.It provides a reliably sealed biological shield to ensure the safety of operatores.The numerical analysis of transfer and purge chamber of CEFR was presented in this paper.The numerical results are satisfied to relative criterion.
【关键词】 中国实验快堆;
转运-清洗室;
静力分析;
抗震分析;
【Key words】 China Experimental Fast Reactor; transfer and purge chamber; static analysis; aseismic analysis;
【Key words】 China Experimental Fast Reactor; transfer and purge chamber; static analysis; aseismic analysis;
- 【文献出处】 原子能科学技术 ,Atomic Energy Science and Technology , 编辑部邮箱 ,2008年S2期
- 【分类号】TL43
- 【下载频次】40