节点文献

重建“加速度”

Speed Up Reconstruction of Hospital in Sichuan

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈平溪

【摘要】 <正>汶川大地震的3年重建,不是简单地恢复原状,而是意味着自我超越。如果说这几年灾难的频发,让人感慨自身在自然面前的渺小,那灾后重生的力量又不禁使人振奋。

【Abstract】 Like many hospitals reconstruction work in Sichuan after the earthquake,the People’s Hospital of Deyang City also received a lot of support from other places.The only difference is that their reconstruction work is not only a simple self-recovery,but also a leapfrog change.As Zhao Luping,the CEO of People’s Hospital said,investment,equipment and support could achieve the recovery reconstruction,but the leapfrog change depends on the spirit,culture and faith.Based on the later,both the soft power and the hard of People’s Hospital has been improved greatly,and the advantages of talents and technologies have shown gradually but obviously.

  • 【文献出处】 中国医院院长 ,China Hospital CEO , 编辑部邮箱 ,2011年10期
  • 【分类号】R19
  • 【下载频次】6
节点文献中: 

本文链接的文献网络图示:

本文的引文网络