隧道开挖施工的爆破振动监测与控制技术

Monitoring and controlling technology for blasting vibration induced by tunnel excavation

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈庆王宏图胡国忠李晓红李开学庞成

【Author】 CHEN Qing1, WANG Hong-tu1, 2, HU Guo-zhong1, LI Xiao-hong1, 2, LI Kai-xue1, PANG Cheng1 (1.Key Lab for Exploitation of China Southwestern Resources & the Environmental Disaster Control Engineering, Ministry of Education, Chongqing University, Chongqing 400044, China; 2. Research Institute of Southwest China Energy and Mineral Resources Development & Safety Technology, Chongqing University, Chongqing 400030, China)

【机构】 重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室,重庆大学西南资源开发及环境灾害控制工程教育部重点实验室 重庆400044,重庆400044重庆大学西南能矿资源开发利用与安全技术研究院,重庆400044,重庆400044,重庆400044

【摘要】 以万松岭隧道工程开挖为研究对象,对隧道工程开挖施工爆破地震波的振动监测方法及控制技术进行了研究。通过对爆破振动监测结果的回归分析,建立了隧道工程开挖爆破振动传播的数学模型;确立了其传播衰减规律。结合工程实际,提出了修正后的爆破地震波衰减经验数学公式;经对比分析,所得爆破地震波衰减规律公式预测的质点振动速度具有较高的精度。同时,结合该隧道工程开挖爆破施工,从选择合理爆破时差、最大装药量、微差起爆、掘进进尺、预裂爆破等5个方面提出了爆破振动控制技术措施使该隧道开挖施工爆破中的地面振动速度值控制在了安全范围以内,从而确保了施工段地面建筑群的安全和该隧道工程开挖爆破作业的安全。其研究对指导隧道工程开挖爆破施工和保证地面建筑物安全起到了重要作用。

【Abstract】 In this paper, based on project excavation of the Wansongling tunnel, the monitoring way and controlling technology of vibration of blasting earthquake wave induced by tunnel excavation were studied. Via regression analysis for the results of monitoring on blasting vibration, the mathematical model of spread of blasting vibration induced by tunnel excavation was established; the orderliness of spread of blasting vibration was drawn. Combined the project, the empirical formula after revised of attenuation of blasting earthquake wave was put forward; Through contrasting and analyzing, the particle vibration velocity were forecasted by the orderliness formula of attenuation of blasting earthquake wave is precise relatively. At the same time, combined the excavation blasting construction of this tunnel project, the controlling technology measures of blasting vibration were put forward from the choice of the reasonable blasting time difference, the maximum charge quantity, the millisecond blasting, the excavation plan, springing blasting, so as to control the vibration velocity of ground within safety range in the process of this tunnel excavation construction, consequently the safety of ground buildings of construction segment and blasting work of this tunnel project was insured. This study will play an important role in guiding the excavation blasting construction of the tunnel project and assuring the safety of ground buildings.

【基金】 国家自然科学基金重点项目(50334060);国家自然科学基金(50474025);重庆市应用基础研究项目(7293);重庆大学大学生创新基金
  • 【文献出处】 岩土力学 ,Rock and Soil Mechanics , 编辑部邮箱 ,2005年06期
  • 【分类号】U456.3
  • 【被引频次】116
  • 【下载频次】1323