节点文献

汶川地震中紫坪铺面板堆石坝永久应变反演分析

Permanent strain of Zipingpu Concrete-Faced Rockfill Dam induced by Wenchuan Earthquake

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘振平迟世春

【Author】 LIU Zhen-ping;CHI Shi-chun;The Faculty of Infrastructure Engineering,Dalian University of Technology;

【机构】 大连理工大学建设工程学部

【摘要】 紫坪铺大坝是世界上第一个遭受强震的百米以上面板堆石坝,在"5.12"汶川地震中有明显的局部损伤。采用有限元数据平滑方法,对大坝位移监测数据进行处理,得到了坝体典型剖面的永久应变。分析了大坝在地震中沉降和堆石料剪胀变形发生的部位和原因,表明坝体最大震陷率发生在2/3坝高附近;大坝发生剪胀的范围为坝顶区域和从坝顶往下25~30 m的上下游坝坡附近;永久剪应变过大是造成面板水平施工缝错台的直接原因。

【Abstract】 Zipingpu Concrete-Faced Rockfill Dam,which was subjected to significant local damage during "5.12" Wenchuan Earthquake,which is the first concrete-faced rockfill dam of more than one hundred meters in height encountering strong earthquake in the world.Based on the finite element data smoothing method,the permanent strain at a typical cross-section of the dam is obtained by processing the monitored displacement data.The positions of the dam settlement and rockfill dilatancy and the causes are analyzed according to the section permanent strain.The results show that the maximum settlement ratio of the dam approximately occurs at 2/3 of the dam height.The dilatancy occurs from the dam crest to 25~30 m in the upstream and downstream slope.The excessive permanent shear strain during the earthquake is the immediate cause for dislocation of the horizontal construction joints in the face slabs.

【基金】 国家自然科学基金项目(50979014,51179024)
  • 【文献出处】 岩土工程学报 ,Chinese Journal of Geotechnical Engineering , 编辑部邮箱 ,2013年09期
  • 【分类号】TV641.4
  • 【网络出版时间】2013-06-20 13:48
  • 【被引频次】4
  • 【下载频次】220
节点文献中: 

本文链接的文献网络图示:

本文的引文网络