节点文献

昆河新线玉蒙段工程地质问题及对策

THE ENGINEERING GEOLOGICAL PROBLEM AND COUNTERMEASURE IN YU-MENG SECTION OF KUN-HE NEW LINE

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘伟张兵

【Author】 LIU Wei1,2,ZHANG Bing1(1.Kunming University of Sciences & Technology,Kunming 650093)(2.Kunming Institute of Exploration & Design,Railway Academy 2 of Sciences,Kunming 650200)

【机构】 昆明理工大学铁二院昆明勘测设计研究院 昆明650200昆明6500932

【摘要】 昆河新线玉蒙段的主要工程地质问题是地震及活动断裂、膨胀土、软土、砂土液化、岩溶、不良斜坡及特殊岩土等,对铁路工程影响很大。文章论述沿线存在的主要地质问题,提出相应的工程措施建议。

【Abstract】 The bad geological and special geotechnical conditions are the main engineering geological problems in engineering construction.The earthquak active fault,swelling soil,soft soil,liquidation of sandy soil,karst and bad geological condition of slope,etc,are the main engineering geological problems in the Yu-Meng section of Kun-He new line,which have great influences on the railway engineering construction.In this paper,we introduce briefly the geological background of this line,have a discussion about the main bad geological and special geotechnical problems of this line and put forward the corresponding engineering countermeasure sugge stion.

  • 【分类号】P642
  • 【下载频次】51
节点文献中: 

本文链接的文献网络图示:

本文的引文网络