节点文献

高压、富水岩溶隧道施工地质预报探讨

Study on Geological Prediction for a High Pressure Water-soaked Karst Tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王公忠

【Author】 Wang Gongzhong(Safty and Engineering Department,Henan Engineering Institute,Henan 451191)

【机构】 河南工程学院安全工程系

【摘要】 在新大瑶山隧道工程中,建立了隧道施工地质预报机构和地质信息系统,采用了宏观控制预报、准确预报、验证预报三级预报方法。由于利用了以野外地质调绘、洞内CCD地质编录、超前水平钻探、TSP203及直流电法为主要探测手段的综合预报技术,提高了预报的科学性、准确性,降低了预报成本。

【Abstract】 In the new Dayaoshan tunnel project,tunnel construction geological prediction agencies and geological information system were established which incorporated three-phase macro-control,accurate and validatation forecasting.In the process of construction a comprehensive geological prediction process was adopted including field geologic surveying and mapping,CCD geological logging,advance horizontal drilling,TSP 203,DC methods,which improved the forecasting accuracy and reduced the cost of prediction.

  • 【文献出处】 现代隧道技术 ,Modern Tunnelling Technology , 编辑部邮箱 ,2010年04期
  • 【分类号】U452.11
  • 【被引频次】10
  • 【下载频次】122
节点文献中: 

本文链接的文献网络图示:

本文的引文网络