节点文献

仁阁隧道软硬岩石交汇地段塌方成因及其处理

Mitigation of Collapse in the Soft and Hard Rock Transition Zone in Renge Tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 熊燕辉

【Author】 XIONG Yanhui(Longyan Shuangyong Highway Engineering Co.Ltd.,Longyan Fujian 364000)

【机构】 龙岩双永高速公路有限责任公司

【摘要】 隧道施工经常会遇到软硬岩石交汇的地段,极易引发隧道塌方。结合仁阁隧道软硬岩石交汇地段塌方工程实例,探讨了利用拱顶架设工字钢梁并配合超前注浆小导管支护进行塌方处理的施工技术要点。

【Abstract】 Due to the different degrees of weathering and the tectonic structures of the rock mass,the non-uniform strength in the rock mass is commonly encountered in the tunneling engineering.The variation of the rock mass strength might cause great difficulties for the tunnel construction.This paper presents a case study of mitigation of a large scale tunnel collapse in the Renge Highway Tunnel of Shuang-Yong Expressway in Longyan City,Fujian Province.The collapse occurred in August 2010 at the soft rock mass zone.The mitigation techniques involved using steel H beams placing at the arch of the tunnel and using small diameter casing in the ahead-grouting supporting.

  • 【文献出处】 土工基础 ,Soil Engineering and Foundation , 编辑部邮箱 ,2013年03期
  • 【分类号】U458.3
  • 【被引频次】2
  • 【下载频次】34
节点文献中: 

本文链接的文献网络图示:

本文的引文网络