节点文献

利用高精度遥感信息辅助设计检波器点位

Using high-precision remote information for auxiliary design of geophone point.

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张友焱雷迎春叶勇胡艳罗伦才

【Author】 Zhang You-yan1, Lei Ying-chun2, Ye Yong1, Hu Yan1 and Luo Lun-cai2. 1.China Research Institute of Petroleum Exploration and Development,Beijing City,100083,China2.Petroleum Geophysical Prospecting Company of Chuan-Qing Drilling Engineering Company, Chengdu City, Sichuan Province, 610213, China

【机构】 中国石油勘探开发研究院川庆钻探工程公司石油地球物理勘探公司

【摘要】 利用高精度遥感数据(分辨率已达亚米级)提取相关信息评价检波器组合、选择有利检波器埋置位置,既可在观测系统设计阶段用于评估采集设计方案能否实施及辅助选择适当检波器组合图形,也可在外业测量前逐点优选检波器组合中心点,从而达到改善接收条件、提高观测系统的可实施性及保证地震资料采集质量的目的。利用高精度遥感数据提取相关信息评价影响检波器接收信号质量的因素,所对应的遥感信息主要用于三个方面的评估:①利用DEM(数字高程模型)与坡度计算检波器组合图形内的平整度与展开能力(组合展开度);②利用检波器组合区域的组内高差、坡度、湿度、地表松散度评价耦合条件的优劣程度(组合优度);③利用综合高精度正射影像与DEM提取的相关信息划定工区内需要避让的地段及不符合HSE规范的施工禁区(可实施性)。实例分析表明,通过遥感影像选择检波器组合与检波器埋置中心,提高了检波器组合内埋置点的平整度与组合展开度,对减轻野外劳动强度、提高劳动生产率、节约成本都起到了重要作用。

【Abstract】 Using high-precision remote data (resolution with sub-meter) to detect relevant information can evaluate geophone array and select favorable geophone planting position, which can not only be used to evaluate that the design plan can be implemented or not and auxiliary select appropriate geophone array pattern, but also optimize the central point of geophone array point by point before field measurement, reaching the goal improving receiving condition and practicableness of geometry and ensuring the quality of signal received by geophone. Using high-precision remote data to detect relevant information can evaluate the factors affecting the quality of signal received by geophone, the corresponding remote information is mainly used for evaluation in following three aspects: ①using DEM and slope to compute flatness and expanding capacity (array expanding degree) within geophone array pattern; ②using difference of elevation, slope, damp and surface porosity within an array in region of geophone array to evaluate good or bad couple condition (array superior degree); ③using relevant information detected by integrative high-precision image and DEM to partition the area that should be avoided in the work zone and forbidden zone of operation that is not corresponding to HSE standard (practicableness). The analysis of practical case showed that the flatness and expanding degree of planting points within a geophone array has been improved by using remote image to select geophone array and planting central of geophone array, playing important role reducing field work efforts, improving work efficiency and practicing economy of cost.

  • 【文献出处】 石油地球物理勘探 ,Oil Geophysical Prospecting , 编辑部邮箱 ,2009年01期
  • 【分类号】P631.4
  • 【被引频次】3
  • 【下载频次】92
节点文献中: 

本文链接的文献网络图示:

本文的引文网络