节点文献
边坡位移监测的若干技术问题
Some technical problems in slope displacement monitoring
【摘要】 本文探讨了影响边坡位移监测精度的若干主要技术问题,认为只有选择恰当的地表位移监测基准,并对监测方案、监测站的布设和监测周期的设计等技术问题进行优化,才能满足边坡变形监测的要求。因此本文在此基础上,建议使用多种监测手段,建立立体监测系统,同时监测地表和地下位移,有助于全面反映边坡的变形破坏情况,从而为边坡的稳定性分析和滑坡预测预报提供科学依据。
【Abstract】 Some key technical problems are discussed.It is proposed that only when the monitoring datum of ground displacement is properly selected and monitoring scheme,monitoring stations arrangement and monitoring period are optimized.The requirements of slope deformation monitoring can be satisfied.On the basis of these,a stereo monitoring system with multiform monitoring measures is suggested to be set up including both the ground displacement monitoring and underground displacement monitoring,which will be favor of showing the situation of slope deformation and destruction,and will provide scientific foundation for slope stability analysis and landslide forecast.
【Key words】 slope displacement monitoring; monitoring datum; optimal design; monitoring station arrangement; monitoring period; stereo monitoring;
- 【文献出处】 水文地质工程地质 ,Hydrogeology & Engineering Geology , 编辑部邮箱 ,2007年05期
- 【分类号】TU43
- 【被引频次】15
- 【下载频次】413