节点文献

河床式水电站主副厂房不同连接形式抗震分析

Seismic analysis for various connection patterns between main and auxiliary powerhouses of water-retaining power stations

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陈婧姚锋娟马震岳张运良

【Author】 CHEN Jing,YAO Feng-juan,MA Zhen-yue,ZHANG Yun-liang(School of Civil and Hydraulic Engineering,Dalian University of Technology,Dalian 116024,China)

【机构】 大连理工大学土木水利学院

【摘要】 结合四川省某河床式水电站的工程实例,通过建立包括主厂房和副厂房在内的厂房坝段整体三维有限元模型,研究了在主厂房和副厂房之间不同的连接形式下厂房整体结构的固有振动特性,并进行共振复核。采用反应谱分析方法对模型进行抗震分析,考察了主厂房和副厂房不同连接形式对厂房(尤其是副厂房)主要构件地震反应的影响规律,提出了合理的连接方案,为该河床式厂房的抗震设计提供科学依据。

【Abstract】 Based on the practices of a water-retaining power station in Sichuan Province,a three-dimensional finite element model was established for the powerhouse integrity including the main and auxiliary powerhouses.The free vibration characteristics and the possibility of resonance of the powerhouse integrity under various connection patterns between the main and auxiliary powerhouses were studied.The spectral analysis was employed to analyze the seismic characteristics of the model.The influences of various connection patterns between the main and auxiliary powerhouses on the seismic responses of the main components of the powerhouses (especially the auxiliary powerhouse) were investigated.A rational scheme for the connection was proposed,and it would provide scientific basis for the seismic design of the water-retaining power station.

【基金】 国家自然科学基金(50679009)
  • 【文献出处】 水利水电科技进展 ,Advances in Science and Technology of Water Resources , 编辑部邮箱 ,2010年01期
  • 【分类号】TV312
  • 【被引频次】6
  • 【下载频次】126
节点文献中: 

本文链接的文献网络图示:

本文的引文网络