节点文献
堰塞坝溃坝过程分析及影响因素研究
Analysis of weir dam break process and study of influence factors
【摘要】 本文通过堰塞坝漫顶溃坝模拟实验,将堰塞坝溃坝归纳概括为初始溃口形成、溃口发展、最终稳定三个阶段。在其他参数相同的情况下,通过对3组实验流量变化的比较,研究了坝体高度、长度与洪峰流量、洪峰来临时间、洪峰持续过程的相互关系,并研究了溃口形状特点,对相关工程应用有一定借鉴意义。
【Abstract】 In the paper,weir dam breaks are concluded into three stages of initial dam break formation,dam development and ultimate stability through weir dam overflow dam break simulation experiment. Under the condition that other parameters are the same. Experiment flow changes of the three groups are compared for studying mutual relationship between dam height and length with flood peak flow, flood peak coming time and flood peak duration, and the characteristics of break shapes are studied,thereby providing certain reference significance for related projects.
【关键词】 堰塞坝;
溃坝过程;
流量;
影响因素;
分析;
【Key words】 weir dam; dam break process; flow; influencing factors; analysis;
【Key words】 weir dam; dam break process; flow; influencing factors; analysis;
- 【文献出处】 水利建设与管理 ,Water Conservancy Construction and Management , 编辑部邮箱 ,2015年05期
- 【分类号】TV122.4
- 【下载频次】54