节点文献

我国地下水电站建设的发展

Development of Underground Hydropower Station Construction

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 翁义孟

【Author】 Weng Yimeng(Pearl River Water Resources Commission of Ministry of Water Resources,Guangzhou 510611,Guangdong,China)

【机构】 水利部珠江水利委员会

【摘要】 建国初期,我国在经济技术水平十分薄弱的基础上开始了地下水电站建设。1980年后,引进了先进技术,设计理论突破,施工技术更新,又好又快地建成了一批高水平的地下水电站,积累了丰富的经验,地下水电站建设取得了巨大的成就。实践表明,地下水电站具有多方面的优越性,有着广阔的发展前景。

【Abstract】 In the early years of new China,the construction of underground hydropower stations is begin even if the economy and technology is very weak at that time.Since 1980,a number of underground hydropower stations in China were soundly and fast built,rich experiences were accumulated and great achievements were made with the introduction of advanced technology,the breakthrough of design theory and the update of construction technology.Practices show that the underground hydropower stations have many advantages,and have broad prospects for development.

  • 【分类号】TV752
  • 【被引频次】5
  • 【下载频次】116
节点文献中: 

本文链接的文献网络图示:

本文的引文网络