节点文献

南水北调西线工程调水区地质灾害问题

Geological Hazards in the Project of Water Division from the South to the North via the Western Course, China

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 马东涛崔鹏陈书涛尚宇鸣涂建军陈杰

【Author】 MA Dong-tao~1, CUI Peng~1, CHEN Shu-tao~2, SHANG Yu-ming~2, TU Jian-jun~1 and CHEN Jie~1(1Institute of Mountain Hazards and Environment, Chinese Academy of Sciences and Ministry of Water Conservancy, Chengdu 610041,Sichuan,China;2 Reconnaissance,Planning,Design and Researching Institute, Yellow River Conservancy Commission, Ministry of Water Conservancy,Zhengzhou 450003,Henan,China)

【机构】 中国科学院水利部成都山地灾害与环境研究所水利部黄河水利委员会勘测规划设计研究院中国科学院水利部成都山地灾害与环境研究所 成都610041成都郑州450003610041

【摘要】 南水北调西线工程地处青藏高原东南部,规划三期工程从长江上游的通天河及其支流雅砻江、大渡河年总调水170×108m3,经输水隧洞穿越江河分水岭巴颜喀拉山入黄河上游,解决黄河上、中游地区严重的水资源短缺问题。本文在对调水区气象气候、水文、地貌、岩性构造等环境背景条件分析研究的基础上,初步论述了西线工程建设中将面临的主要地质灾害问题,如水库诱发地震、库岸再造和岸坡变形、多年冻土和季节冻土、泥石流和严重水土流失、深埋长隧洞的高地温、高地应力岩爆、涌水及碎屑流等。针对这些灾害问题和西线工程目前现状,提出了五点指导性防灾建议。

【Abstract】 Located in south-east of the Qinghai-Tibetan Plateau, the Project of Water Division from the South to the North via the Western Course is planned to divert 17 billions m~3 of water from Tongtianhe River, the upper reach of Yangtze River, and its branches Yalongjiang River and Daduhe River, and deliver the water via the tunnels across the watershed ridge of Bayankala Mountain to the upper Yellow River so as to solve the serious shortage of water source in northwestern region of China Which is planed in 3 construction stages and will be finished at the year of 2050, it will become the greatest water division project in the world Based on analyzing the environmental background such as meteorology, hydrology, geomorphology, geology and Neo-tectonics etc., the geologic hazards during construction of the Project in Western Course are discussed in the paper, which are earthquakes triggered by reservoirs, landslides and collapses of bank slope caused by cutting and reservoir water, freezing, thawing and frost-susceptibility of permafrost and seasonal frozen ground, debris flow hazards and serious water and soil erosions, and the high ground temperature, high ground stress and rock explosion, high pressure drained water and fault belt debris flow inner deep-seated long tunnels et al Five mitigation countermeasures are suggested according to surveying, prospecting and study situation of the Project Most of all, some professional studies such as the inter-relationship between different geological hazards and divisional engineering should be carried out for reducing and comprehensively controlling hazards, and promoting coordinate development of human engineering activities and environment 

【基金】 国家自然科学基金项目西部重大研究计划(90202007)资助 ~~
  • 【文献出处】 山地学报 ,Journal of Mountain Research , 编辑部邮箱 ,2003年05期
  • 【分类号】P694
  • 【被引频次】12
  • 【下载频次】349
节点文献中: 

本文链接的文献网络图示:

本文的引文网络