汶川8级地震对岷江上游泥石流灾害防治的影响

The Influence on Debris Flow Prevention in the Upriver of Minjiang After Wenchuan Earthquake

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 游勇柳金峰

【Author】 YOU Yong1,2,LIU Jin-feng1,2(1.Key Lab.of Mountain Surface Process and Hazards,Chinese Academy of Sciences,Chengdu 610041,China;2.Inst.of Mountain Hazards and Environment,Chinese Academy of Sciences,Chengdu 610041,China)

【机构】 中国科学院山地灾害与地表过程重点实验室中国科学院水利部成都山地灾害与环境研究所

【摘要】 汶川8级地震直接引发了大量的崩塌、滑坡等次生灾害,为泥石流提供了丰富的物质来源,在经历过2008年雨季后,激发了一定数量的泥石流,在今后5~10 a的时期内,还将激发大量的泥石流。震后岷江上游泥石流今后的发展趋势,主要取决于是否产生暴雨以及暴雨笼罩范围,地震引发的崩塌、滑坡是否堵塞沟道与泥石流发生、发展也有密切关系。地震后,岷江上游的泥石流防治也将面临着严峻的形势。通过对岷江上游典型泥石流沟防治工程现状的统计,指出了目前防治工程存在着数量少、标准低、承灾能力差、结构单一、设计不合理等问题,在此基础上,提出了岷江上游的泥石流灾害防治原则。

【Abstract】 The Wenchuan Earthquake triggered large numbers of secondary disasters such as landslip and landslide.After the 2008 rainy season,large numbers of debris flow with large scale were triggered.So,the prevention of debris flow in the earthquake area will be faced with many new problems.The geology,topography and climate conditions in the upriver of Minjiang are favorable to the formation of debris flow.The debris flow of this area is well developed in the history.Based on the field investigation,there are 404 debris flow gullies in the upriver of Minjiang.Large numbers of landslips and landslides,which triggered by the Wenchuan Earthquake,provide abundant materials for debris flow’s formation.In the next five to ten years,the damage of debris flow in this area will be more serious.The developmental tendency of debris flow in the upriver of Minjiang mainly depends on the whether rainstorm is formed,whether the earthquake area is included in the rainstorm and whether channels are blocked by landslips or landslide.After the Wenchuan Earthquake,the prevention situation of debris flow in the upriver of Minjiang will be serious.In this paper,the prevention projects of typical debris flow gullies in the upriver of Minjiang are collected.Then,main problems of the prevention projects(such as small quantity,low standard,low preventing ability,simple structure and irrational design) are summarized.At last,the principles of debris flow’s prevention in the upriver of Minjiang are put forward.

【基金】 国家科技支撑计划资助项目(2006BAC10B04);国家973计划资助项目(2008CB425803)
  • 【文献出处】 四川大学学报(工程科学版) ,Journal of Sichuan University(Engineering Science Edition) , 编辑部邮箱 ,2009年S1期
  • 【分类号】P642.23
  • 【被引频次】40
  • 【下载频次】609
节点文献中: 

本文链接的文献网络图示:

本文的引文网络