金沙江下游梯级水电站抗震安全分析

Aseismatic Safety Analysis of the Cascade Hydroelectric Power Stations on the Lower Jinsha River

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张超然陈先明朱红兵

【Author】 ZHANG Chao-ran,CHEN Xian-ming,ZHU Hong-bing(China Three Gorges Project Corporation,Yichang 443002,China)

【机构】 中国长江三峡工程开发总公司

【摘要】 2008年5月12日四川汶川发生特大地震,四川省内大中型水电工程均经受住了超标准地震的考验,仅位于震中地区的水电工程不同程度地受到了损坏。根据流域水电开发规划,金沙江下游拟开发建设乌东德、白鹤滩、溪洛度和向家坝四座大型水电站,目前溪洛渡和向家坝水电站已开工建设,乌东德和白鹤滩水电站正处于可行性研究阶段。通过对区域地质背景、工程近场区断层活动性、历史地震活动及坝址区地震危险性分析,认为金沙江下游四座梯级水电站所选定的坝址区域均处于一个地质相对稳定地块,且避开了区域主干断裂和活动断层。通过采用拱梁分载法和有限元分析等方法对拱坝进行静、动力结构计算以及采用刚体极限平衡法对拱坝坝肩进行稳定分析,计算结果表明大坝抗震安全满足国家和行业有关规程规范要求,且具有较高的安全裕度。

【Abstract】 During the Wenchuan huge earthquake in Sichuan on 12 May 2008,all of the big and middle type of hydroelectric projects run well except that some in the epicenter were partly destroyed to some extend.According to the river development plan of hydro power,four huge hydro powerstations will be built on the lower Jinsha river including Wudongde,Baihetan,Xiluodu and Xiangjiaba hydroelectric powerstations.Up to now,the constructions of Xiluodu and Xiangjiaba powerstations have started,and Wudongde and Baihetan powerstations are in the phase of the feasibility study.The analysis of the region geology background,the activity of faults close to the dam site,history earthquake in the region,and the earthquake harzad,showed that all of the four powerstations stand on the relatively stable block and the region main fractures and activity faults are avoided.What’s more,the static and seismic calculations for arch dam structure by the trial load method and elastic finite analysis,and the stability analysis for arch shoulders by the rigid body limit equilibrium method,showed that the aseismatic safety of the dams meet the requirements of the Chinese specifications and codes.

  • 【文献出处】 四川大学学报(工程科学版) ,Journal of Sichuan University(Engineering Science Edition) , 编辑部邮箱 ,2009年03期
  • 【分类号】TV731;TV312
  • 【被引频次】1
  • 【下载频次】225
节点文献中: 

本文链接的文献网络图示:

本文的引文网络