节点文献

大型露天煤矿修筑坡道技术

Technology of Constructing Rampway in Large Opencast Coal Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李文明刘月亭郭江州

【Author】 LI Wenming;LIU Yueting;GUO Jiangzhou;Haerwusu Opencast Coal Mine,Shenhua Jungar Energy Limited Liability Company;

【机构】 神华准格尔能源有限责任公司哈尔乌素露天煤矿

【摘要】 本文提出了两项大型露天煤矿修筑斜坡道的关键技术:通过抛掷爆破修筑斜坡道技术及推土机通过下推槽法修筑斜坡道技术。两项修筑坡道技术在哈尔乌素露天煤矿应用效果良好,既提高了作业效率,又降低了生产成本,具有极高的推广价值。

【Abstract】 In this paper,two key technologies for the construction of inclined roadway in large-scale opencast coal mines are put forward:the technology of building ramps by throwing blasting and the technology of building ramps by bulldozer by means of downward grooving. The application of the two ramp construction techniques in Haerwusu opencast coal mine has obtained good effects,which not only improves the operation efficiency but also reduces the production cost,so it has very high popularization value.

  • 【文献出处】 神华科技 ,Shenhua Science and Technology , 编辑部邮箱 ,2019年05期
  • 【分类号】TD824.7
  • 【被引频次】1
  • 【下载频次】18
节点文献中: 

本文链接的文献网络图示:

本文的引文网络