节点文献

贵州寨子危岩崩塌风险定量评价研究

Quantitative risk assessment for Zhaizi rockfall in Guizhou Province

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 覃乙根杨根兰鲁鲲鹏吴运武

【Author】 QIN Yigen;YANG Genlan;LU Kunpeng;WU Yunwu;College of Resource and Environment Engineering, Guizhou University;Bureau of Land and Resources,Kaiyang County, Guiyang City, Guizhou Province;

【通讯作者】 杨根兰;

【机构】 贵州大学资源与环境工程学院贵州省贵阳市开阳县国土资源局

【摘要】 寨子崩塌历史上曾发生多次崩塌,残留的大量危岩体严重威胁着下方420名村民的生命财产安全,开展相应的风险评估研究具有紧迫性和必要性。通过无人机倾斜摄影、三维实景建模和ploywork点云数据处理技术获取崩塌坡体的地质和几何信息,识别出该坡面上存在3块危岩体。根据结构面组合关系和假定断面法对危岩体的体积进行了确定。基于历史崩塌块石的统计,根据崩塌的MCF关系,确定崩塌的年发生概率。基于历史崩塌块石滞留位置,采用参数反演和随机性崩塌运动模拟分析,得出崩塌的到达概率。结合时空分布概率调查和易损性分析,对贵州寨子崩塌进行了崩塌风险定量评价(QRA)。结果表明:无论在晴天期还是雨天期,危岩体1~3均处于警告区间,建议加强监测并采取一定的防灾减灾措施。评价方法和结果可为其他单体崩塌灾害风险定量评价研究提供参考。

【Abstract】 Zhaizi rockfall collapsed many times in the history and a large number of residual dangerous rock masses seriously threaten the life and property safety of 420 villagers below the rockfall. It is urgent and necessary to carry out the corresponding risk assessment research. In this paper, the geological and geometric information of the collapse are obtained by UAV tilt photography, 3 D scene modeling and ploywork point cloud data processing technology, and three dangerous rock masses on the slope were detected. The volume of dangerous rock mass was determined according to the combination relation of structural plane and the assumed section method. Based on the statistics of the historical rockfall, the collapse annual occurrence probability was derived from a MCF distribution of rockfall event. Based on the retention position of the historical rockfall, the probability of rockfall arrival was obtained by means of parameter inversion and random rockfall simulation analysis. Combined with the analysis of spatial and temporal distribution probability and vulnerability, the quantitative risk assessment(QRA) of this rockfall is carried out. The results show that no matter in sunny or rainy days, the risk values of blocks 1,2 and 3 are in the warning range. It is suggested to strengthen monitoring and take certain disaster prevention and mitigation measures. The assessment method and results can provide a reference for quantitative risk assessment of other rockfall research.

【基金】 贵州省科学技术项目(黔科合J字2244);贵州省科技平台及人才团队计划项目(黔科合平台人才[2017]5402号);贵州省专业学位研究生课程案例库[黔教合YJSCXJH﹝2018﹞089]
  • 【分类号】P642.21
  • 【被引频次】9
  • 【下载频次】223
节点文献中: 

本文链接的文献网络图示:

本文的引文网络