巴基斯坦N-J水电站地下厂房边墙变形分析

Deformation and analysis of side wall of underground powerhouse of N-J Hydropower Station in Pakistan

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 陆宗磐陈洪莲

【Author】 LU Zongpan;CHEN Honglian;China Water Resources Beifang Investigation, Design & Research Co., Ltd.;

【机构】 中水北方勘测设计研究有限责任公司

【摘要】 巴基斯坦N-J水电站地下厂房围岩岩性为软硬相间的砂岩与泥(页)岩,围岩类别以Q4为主,且节理裂隙发育;尾水闸门操作室设在主厂房内,局部形成大跨度的洞室,施工开挖过程中下游边墙产生较大的变形。经分析,厂房布置不合理是变形大的主要原因,而地质条件差则是控制因素,加剧了变形的发展。通过调整开挖次序和增强支护措施,围岩已趋于稳定。

【Abstract】 The rock lithology for the underground powerhouse of N-J hydroelectric project in Pakistan is alternated beds of sandstone and mudstone (shale). The surrounding rock is mainly classified as Q4 with developed joint fissures. Tailrace gate chambers are located inside the main powerhouse cavern that locally forms a large-span underground cavern. Large deformation occurred on downstream wall during the excavation of the main cavern. Through analysis, it is concluded that the main cause of large deformation is unreasonable powerhouse arrangement, and the poor geological conditions are control factors intensifying the development of deformation. By adjusting the excavation sequence and enhancing the rock supporting measures, the surrounding rock mass has tended to be stable.

  • 【分类号】TV738
  • 【下载频次】59
节点文献中: 

本文链接的文献网络图示:

本文的引文网络