节点文献

“布—也”35kV输电线路24号铁塔倒塔原因与对策探析

Analysis of ‘Bu-Ye’ 35kV power transmission line No. 24 iron tower collapse reasons and countermeasures

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 杨存喜

【Author】 YANG Cunxi;MWR Xinjiang Uygur Autonomous Region Hydro and Power Design Institute;

【机构】 新疆维吾尔自治区水利水电勘测设计研究院

【摘要】 作为一种风敏感结构体系,塔—线输电结构在遇到强风条件下容易产生风振,给塔架结构安全性带来隐患,严重时易造成弯塔、倒塔事故。本文对"布—也"35k V输电线路在极端恶劣大风条件下发生的24号铁塔倒塔原因进行了分析,并提出了几种铁塔升级、加固对策,旨在提高输电线路铁塔的可靠性和安全性。

【Abstract】 Tower-line power transmission structure can easily produce wind-induced vibration under the condition of strong wind as a wind-sensitive architecture,thereby bringing hidden danger to tower structure safety,tower can be bended and collapsed in serious condition. In the paper,reasons of No. 24 iron tower collapse in ‘Bu- Ye’35k V power transmission line under strong wind conditions are analyzed,several iron tower updating and reinforcement countermeasures are proposed aiming at improving power transmission line iron tower reliability and safety.

  • 【文献出处】 中国水能及电气化 ,China Water Power & Electrification , 编辑部邮箱 ,2015年04期
  • 【分类号】TM753
  • 【下载频次】37
节点文献中: 

本文链接的文献网络图示:

本文的引文网络