节点文献

宽沟煤矿坚硬厚层顶板下冲击地压危险时期的微震特征及解危措施

Micro-seismic characteristic and danger-relief method in rock-burst danger period of mining face under hard and thick roof of Kuangou Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李浩荡蓝航杜涛涛侯德健

【Author】 LI Hao-dang1,LAN Hang2,3,DU Tao-tao2,3,HOU De-jian4(1.Coal Mining Department,Shenhua Group Co.,Ltd,Beijing 100011,China;2.Coal Mining & Designing Department,Tiandi Science & Technology Co.,Ltd,Beijing 100013,China;3.Rock Mechanics & Supporting Professional Committee,China Coal Society,Beijing 100013,China;4.Kuangou Mine,Shenhua Xinjiang Energy Corporation Ltd.,Urumqi 830027,China)

【机构】 神华集团有限责任公司煤炭生产部天地科技股份有限公司开采设计事业部中国煤炭学会岩石力学与支护专业委员会神华新疆能源有限责任公司宽沟煤矿

【摘要】 针对某矿坚硬厚层顶板条件下采煤工作面发生的冲击地压灾害,分析了灾害发生的原因并提出了防治原则。采用数值模拟和物探方法确定了工作面在3面采空条件下的冲击地压危险时期和危险区域。冲击地压危险时期的微震监测结果表明:围岩破坏高度比非危险时期显著增大,围岩震动呈现出高能量和低频次的特征,工作面推进度宜控制在3.2 m/d以内。在冲击地压危险时期采取了工作面架间切顶爆破的措施,经电磁辐射和微震监测检验,有效降低了工作面前方煤体应力,取得了较好的解危效果,保证了工作面在冲击地压危险时期的安全。

【Abstract】 The cause of a rock-burst in a mining face under hard and thick roof was analyzed and rock-burst prevention principle was put forward on the basis of this.Rock-burst danger period and danger area of the mining face surrounded by 3 gobs was obtained by numerical simulation and geophysical prospecting method.Micro-seismic monitoring data show that breaking height of surrounding rock in rock-burst danger period is higher than that in non-danger period,rock seismic take on a characteristic of high energy and low frequency,and mining speed should be controlled below 3.2 m/d.Roof-broken blasting between powered supports in mining face was adopted to reduce rock-burst danger degree.Electromagnetic radiation and micro-seismic monitoring show that blasting effect is perfect and coal stress ahead of mining face is reduced effectively.Mining safety in rock-burst danger period is ensured.

  • 【文献出处】 煤炭学报 ,Journal of China Coal Society , 编辑部邮箱 ,2013年S1期
  • 【分类号】TD324
  • 【被引频次】17
  • 【下载频次】575
节点文献中: 

本文链接的文献网络图示:

本文的引文网络