节点文献

塔山矿综放工作面停采线合理煤柱宽度实测

Actual Measurement for Reasonable Coal Pillar Width of Fully Mechanized Caving Face Stopping Line of Tashan Coal Mine

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 崔树江

【Author】 CUI Shujiang;School of Resource and Safety Engineering,China University of Mining & Technology (Beijing);Shanxi Lu’an Mining Group Company;

【机构】 中国矿业大学(北京)资源与安全工程学院山西潞安矿业集团公司

【摘要】 为了掌握综放工作面停采后超前支承压力分布及影响范围,分析研究既能满足巷道维护需要,又尽可能地减小煤柱损失的停采线煤柱宽度,通过在综采放顶煤工作面中间回风巷布置应力观测区和煤体松动范围观测区,动态监测煤柱内应力变化,同时进行了巷道围岩松动范围观测。结果表明:停采线煤柱应力测试中,最大应力读数为3.90 MPa,最小2.50 MPa,煤柱内50~170 m范围内受超前压力影响较小;停采线煤柱可减少到160 m。

【Abstract】 In order to master the abutment pressure distribution and its influence scope of the fully mechanized caving face stop line,we analyze a reasonable coal pillar width which both can meet the needs of roadway maintenance and reduce the loss of coal pillar as much as possible. We dynamically monitor the stress changes of coal pillar and roadway surrounding rock loose range through arranging stress and the coal body loose scope observation areas at fully mechanized caving face return air lane. The results show that the maximum stress readings is 3. 90 MPa and minimum is 2. 50 MPa,which suggest that the coal pillar width within 50 m to 170 m is reasonable by abutment pressure,and the coal pillar width of stopping line could be reduced to 160 m.

  • 【文献出处】 煤矿安全 ,Safety in Coal Mines , 编辑部邮箱 ,2015年03期
  • 【分类号】TD822.3
  • 【被引频次】5
  • 【下载频次】95
节点文献中: 

本文链接的文献网络图示:

本文的引文网络