节点文献

小浪底工程中的关键力学问题

MAJOR MECHANICAL PROBLEMS IN THE XIAOLANGDI PROJECT

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 沈凤生林秀山

【Author】 SHEN Fengsheng, LIN Xiushan (Reconnaissance Planning Design and Research Institute, Zhengzhou 450003, China)

【机构】 水利部黄委会勘测规划设计研究院!郑州450003

【摘要】 黄河小浪底工程规模宏大、地理位置重要、地质条件复杂、运用要求严格、水沙条件特殊,被称为世界上最具挑战性的水利工程之一.坝址区复杂的地质和黄河高含沙水流是小浪底工程技术复杂的主导因素.在土力学和土动力学、岩石力学、结构力学和结构动力学、水工水力学等多个力学领域中解决了关键技术问题,在一定程度上推动了工程力学中的试验分析方法和分析手段的发展.

【Abstract】 The Yellow River Xiaolangdi Project is characterized by large scale, important geographic location, complicated geological conditions, strict operational requirements and unique water and sediment regime, thus becomes one of the most challenging water projects in the world. The technical complexity of the project is mainly due to its complicated geological conditions and high sediment concentration of the Yellow River flow. Major technical problems have been solved in the fields of soil mechanics and soil dynamics, rock mechanics, structural mechanics and structural dynamics and water engineering hydraulics and have also pushed forward the development of the testing and analysis methods in engineering mechanics.

  • 【文献出处】 力学与实践 ,Mechanics and Engineering , 编辑部邮箱 ,2001年01期
  • 【分类号】TV752
  • 【被引频次】1
  • 【下载频次】125
节点文献中: 

本文链接的文献网络图示:

本文的引文网络