毛尔盖水电站库尾红岩滑坡稳定性分析与治理措施

Analysis on Stability of Redstone Landslide in Reservoir Tail Area at Maoergai Hydropower Station and the Countermeasures

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 张丹崔长飞沈习文

【Author】 ZHANG Dan,CUI Changfei,SHEN Xiwen(HYDROCHINA Chengdu Engineering Corporation,Communication Institute,Chengdu 610072,China)

【机构】 中国水电顾问集团成都勘测设计研究院交通分院

【摘要】 针对毛尔盖水电站库尾移民安置点后缘红岩滑坡,分析其形成机理;在考虑天然、暴雨、地震工况条件下,以传递系数法分析红岩滑坡的稳定性,采用STAB2009程序对采取减载后红岩滑坡的稳定性进行了分析,并提出了红岩滑坡设计方案与治理措施。

【Abstract】 In relation to the redstone landslide at the back of resettlement region in reservoir tail area at Maoergai Hydropower Station,the formation mechanism thereof is studied.Taking the conditions of nature,rainstorm and earthquake into consideration,the landslide stability is analyzed by means of transfer coefficient and,with STAB2009 program,the stability on conditions of deloading is analyzed.In addition,the design scheme and the treatment measures are proposed as well.

【关键词】 滑坡稳定性分析治理措施
【Key words】 landslidestability analysistreatment measures