【作者】 陈连刚邓林

【Author】 CHEN Lian-gang1,DENG Lin2(1.China Railway Tunnel Corporation Co.,Ltd.,Zhengzhou 450003,China;2.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China)

【机构】 中铁隧道股份有限公司西南交通大学土木工程学院

【摘要】 通过室内试验与土体物理力学参数反分析相结合,综合确定锦屏水电站大沱后坡岩土体物理力学参数。在此基础上,利用传递系数法对边坡进行稳定性计算,结果表明:在天然情况下为基本稳定-稳定状态;在暴雨条件下,后坡局部表层失稳,整体稳定。

【Abstract】 Through indoor test combined with soil mass physical and mechanical back analysis,physical and mechanical parameters of rock and soil mass of Datuo back slope of Jinping Hydropower Plant are determined.On that basis,slope stability is calculated with transfer coefficient method.It is educed that slope is under basic stable to stable state under natural condition.Under rainstorm condition,back slope local surface losses stability,but the whole is stable.

【关键词】 锦屏水电站边坡稳定性
【Key words】 Jinping Hydropower Plantside slopestability
  • 【文献出处】 路基工程 ,Subgrade Engineering , 编辑部邮箱 ,2010年03期
  • 【分类号】U416.14
  • 【被引频次】1