节点文献

双线隧道爆破振动危害数值模拟研究

Numerical simulation of blasting induced vibration damage on double-track tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 粟闯刘敦文向海波杜年春杨光柯庆辉

【Author】 SU Chuang1,2, LIU Dunwen2, XIANG Haibo1, DU Nianchun1, YANG Guang2, KE Qinghui2 (1.China Nonferruos Mentalsindustry Changsha Investigation and Design Research Institute, Changsha 410011, China; 2. School of Resources and Safety Engineering, Central South University, Changsha 410083, China)

【机构】 中国有色金属工业长沙勘察设计研究院中南大学资源与安全工程学院

【摘要】 以某双线隧道为研究对象,运用ANSYS/LS-DYNA程序就爆破动荷载对隧道结构影响进行有限元分析,获得了掘进隧道和相邻隧道质点振速、单元最大主应力分布特征,计算得到质点峰值振速与实测结果相对误差不超过8%.数值模拟的最大主应力结果表明:掘进隧道右侧墙受爆破振动影响最大,拱肩次之,拱脚处爆破影响最小;相邻隧道迎爆侧受爆破振动影响严重,侧墙处影响最大,拱顶次之,背爆侧受爆破影响小.

【Abstract】 Taking a double-track tunnel to study, the tunnel structure effects under blasting load were analyzed by the ANSYS/LSDYNA program, and the features of the vibration velocity and maximum principal stress were obtained, the relative error between the calculated peak particle velocity and the measured results is less than 8% by comparing the simulation results and measured data. Simulation results of the maximum principal stress showed that the right side wall of construction tunnel was the most urgently affected, the spandrel less, the arch springing the least. The blasting side of adjacent tunnel was urgently affected, the side wall the most, the vault less, the dorsal side of blasting was little affected.

【关键词】 隧道爆破振动数值模拟
【Key words】 tunnelingblasting induced vibrationnumerical simulation
【基金】 湖南省自然科学基金资助项目(06JJ3030)
  • 【文献出处】 矿业工程研究 ,Mineral Engineering Research , 编辑部邮箱 ,2010年03期
  • 【分类号】TD235.1
  • 【被引频次】1
  • 【下载频次】175
节点文献中: 

本文链接的文献网络图示:

本文的引文网络