节点文献

VSP技术在缅甸石油勘探区块的应用

Application of VSP technology in Myanmar

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 黎玮

【Author】 Li Wei.SIPC Myanmar Petroleum Co.Ltd.,Yangon,Myanmar

【机构】 中国石化集团国际石油勘探开发公司缅甸石油有限公司

【摘要】 缅甸中部曼德勒市以西某石油勘探区块勘探程度低,面临许多急需解决的地质问题。A-1井是中国石化在该区块开钻的第1口探井,2008年油气测试获得了较好的油气显示。在A-1井首次采集了零偏和非零偏VSP资料,进行了初至拾取、三分量旋转、波场分离、反射波成像等处理;综合利用A-1井的测井、钻井、VSP、二维地面地震等资料,标定了该区块A-1井处地震反射波组的地质属性,确定了主断层的断点位置,建立了泊松比参数与主力含气层段、非出气层段等的特征关系。VSP技术的应用在该区块的油气勘探中发挥了积极的作用。

【Abstract】 Well A-1 is the first exploration well drilled by SINOPEC in Myanmar.It turned out promising oil show in testing for oil.Both zero-offset and offset VSP data were acquired and they were processed by series of steps including first arrival pickup,3-component rotation;wavefield separation,and reflection imaging.By jointly using logging,drilling,VSP and 2-D seismic data,we tied main seismic horizons to geology,determined the location of major fault PA in well A-1,and established the correlation of gas-bearing and non-gas-bearing interval with Poisson’s ratio.

【关键词】 零偏VSP非零偏VSP标定断层泊松比
【Key words】 zero-offset VSPoffset VSPcalibrationfaultPoisson’s ratio
  • 【文献出处】 勘探地球物理进展 ,Progress in Exploration Geophysics , 编辑部邮箱 ,2009年02期
  • 【分类号】P631.4
  • 【被引频次】6
  • 【下载频次】244
节点文献中: 

本文链接的文献网络图示:

本文的引文网络