节点文献

基于改进CRITIC法与云模型相结合的高速公路路堑高边坡工程施工安全总体风险评估模型研究

Research on Overall Risk Assessment Model of Construction Safety of Freeway High Cutting Slope Engineering Based on Improved CRITIC Method and Cloud Model

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 涂圣文郑克梅张尧王冰邓梦雪

【Author】 TU Shengwen;ZHENG Kemei;ZHANG Yao;WANG Bing;DENG Mengxue;School of Material and Architecture Engineering,Guizhou Normal University;

【机构】 贵州师范大学材料与建筑工程学院

【摘要】 针对高速公路路堑高边坡工程施工安全风险评估过程中存在模糊性与随机性的特点,基于处理不确定信息的云模型理论,提出一种基于改进CRITIC法与云模型相结合的高速公路路堑高边坡工程施工安全总体风险评估模型。该模型依据边坡工程施工安全总体风险评估指标体系及风险分级标准,计算各评估指标隶属于不同风险等级的云模型特征参数;考虑评估指标的信息量和指标之间的相关性,采用改进CRITIC法确定各评估指标的权重,代入边坡工程各评估指标的评分分值,得到待评边坡工程隶属于各风险等级的综合确定度,并依据最大确定度原则判定边坡工程的风险等级;最后将模型应用于《指南》中3个边坡工程案例的施工安全总体风险评估中,并将模型评估结果与《指南》中方法评估结果进行对比分析,结果表明该模型运用于边坡工程施工安全总体风险评估是有效、可行的,且模型评估结果更贴近边坡工程实际的风险状况,为边坡工程施工安全总体风险评估提供了一条新途径。

【Abstract】 In view of the fuzziness and randomness in the process of construction safety risk assessment of freeway high cutting slope,this paper proposes an overall risk assessment model for slope construction safety based on the improved CRITIC method and the cloud model.According to the overall risk assessment index system and classification standard of slope construction safety,the model calculates the cloud model parameters of each evaluation index belonging to different risk levels,and considers the amount of information and correlation of the indicators.The paper determines the weights of evaluation indexes by the improved CRITIC method,and obtains the comprehensive certainty of slope engineering by replacing scoring value of each evaluation index of the slope engineering,and the risk grade of slope engineering is determined according to the principle of maximum certainty.Finally,the paper applies the model to the overall risk assessment of construction safety in three cases in the Guide,and the evaluation results are compared with the Guide method.The results show that the model is effective and feasible for the overall risk assessment of construction safety of high cutting slope engineering of freeway,and the results of model evaluation are closer to the actual risk situation of slope engineering,which provides a new way for the overall risk assessment of construction safety of freeway high cutting slope engineering.The results show that the model is effective and feasible in slope construction risk assessment.The evaluation results can reflect the actual situation and provide a new way for slope construction risk assessment.

【基金】 贵州省科技厅-贵州师范大学联合基金项目(黔科合LH字[2016]7225号);贵州省研究生教育创新计划项目(GZZ2017010);贵州师范大学2015年博士基金项目;国家级大学生创新创业训练计划项目(201710663058)
  • 【文献出处】 安全与环境工程 ,Safety and Environmental Engineering , 编辑部邮箱 ,2019年03期
  • 【分类号】U416.1;U415.1
  • 【被引频次】15
  • 【下载频次】485
节点文献中: 

本文链接的文献网络图示:

本文的引文网络