节点文献

含夹矸厚煤层大采高仰采煤壁破坏机理与注浆加固技术

Failure mechanism and grouting reinforcement technique of large mining height coal wall in thick coal seam with dirt band during topple mining

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 王家臣杨印朝孔德中潘卫东

【Author】 WANG Jiachen;YANG Yinchao;KONG Dezhong;PAN Weidong;School of Resources and Safety Engineering,China University of Mining & Technology (Beijing);

【机构】 中国矿业大学(北京)资源与安全工程学院

【摘要】 详细分析了煤壁破坏的一般机理,结合邢台东庞矿2612大采高工作面实际,总结了煤壁破坏的主要形式,建立了大采高仰采工作面含有夹矸煤层煤壁破坏的力学模型,得出了顶板压力、夹矸厚度、仰采角度、煤体内聚力等对煤壁稳定性有较大影响,其中缓解煤壁的顶板压力是防止煤壁破坏的最有效措施。通过理论分析、UDEC数值模拟等研究了夹矸煤层煤壁注浆加固的合理钻孔位置和参数,得出最佳的布孔位置是注浆孔要和煤壁破坏的起坏点位置一致。同时介绍了2612大采高工作面实际的煤壁注浆工艺和实施效果。

【Abstract】 In this paper, the general mechanism of rib spalling was analyzed in detail, the main failure form of coal wall was summarized combined with the real conditions of 2612 coal face in Dongpang Mine, and the mechanical model of rib spalling in topple mining face with large mining height was established. The results show that the roof pressure, dirt band thickness, topple mining angle, coal cohesion, et al, have a great influence on the coal wall stability, and relieving the roof pressure of coal wall is the most effective measure to prevent coal wall failure. Meanwhile, the reasonable drilling position and grouting reinforcement parameters of coal seam with dirt band were studied by theoretical analysis, UDEC numerical simulation, etc. The studies show that the grouting holes drilled in the breakdown point of rib spalling is the best solution. In addition, the coal wall grouting process and implementation effect in 2612 coal face with large mining height was introduced.

【基金】 国家重点基础研究发展计划(973)项目(2013CB227903);国家自然科学基金煤炭联合基金重点项目(U1361209);2014博士拔尖创新人才项目(8000152650)
  • 【文献出处】 采矿与安全工程学报 ,Journal of Mining & Safety Engineering , 编辑部邮箱 ,2014年06期
  • 【分类号】TD355
  • 【被引频次】19
  • 【下载频次】521
节点文献中: 

本文链接的文献网络图示:

本文的引文网络