Study of cutting slope and unloading scheme for No.1 loose rock mass in the right bank of Yagen hydropower station
【摘要】 通过对松动体地质情况及滑移模式的研究,以蓄水+地震工况来确定牙根水电站右岸1号松动体的削坡减载方案,结果表明,松动体开挖平台高程为2565 m,开挖边坡最好选用预应力锚索支护。
【Abstract】 Through studying the qeological conditions of loose body and ship model,the water and earthquake condition at the same time is used to confirm the cutting slope and unloading scheme for No.1 loose rock mass in the right bank of Yagen hydropower station.It shows the excavation platform height for No.1 loose rock mass is 2 565 m and the prestressed anchor support scheme is the best choice for the excavation slope.
【关键词】 拉裂松动体;
地震作用;
削坡减载;
水电站;
【Key words】 loose rock mass; earthquake effect; cutting slope and unloading; hydropower station;
【Key words】 loose rock mass; earthquake effect; cutting slope and unloading; hydropower station;
【基金】 “十一五”国家科技支撑计划重点项目(项目编号:2008BAB29B03-4)