节点文献

隧道围岩变形及裂缝原因浅析

On the reasons of crack and the surrounding rock becomes deformed of tunnel

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 刘甩利

【Author】 LIU Shuai-li

【机构】 山西省地球物理化学勘查院

【摘要】 通过资料收集及现场岩土勘察,对晋中某隧道在掘进98 m后,洞顶上覆土体发生沉降变形,洞体出现塑性变形及两侧拱腰处出现裂缝的原因进行了分析,并提出相应的治理措施,以解决隧道开挖过程中的围岩变形和裂缝等问题。

【Abstract】 By means of datum gathers the crag earth prospecting at field to adjust Jinzhong tunnel is living 98 m queen tunnellings.Covering the earth part of the body on the peak of hole happen subsiding the deformation.The hole part of the body has ariseed plastic deformation and reason that the two sides waist parts have ariseed the split to be analysed,moreover propose administering of relevant,so as to solve the rock deformed and crack in tunnel construcing,to solve the problems of coffer deformation and crack in tunnel excavation.

【关键词】 隧道围岩变形裂缝
【Key words】 tunnelsurrounding rock becomes deformedcrack
  • 【文献出处】 山西建筑 ,Shanxi Architecture , 编辑部邮箱 ,2008年11期
  • 【分类号】U456.31
  • 【被引频次】3
  • 【下载频次】58
节点文献中: 

本文链接的文献网络图示:

本文的引文网络