节点文献
工作面隐伏断层矿井地震波超前探测
Advanced Detection of Earthquake Wave for the Faults Concealed in Working Face of Mining Well
【摘要】 为防止生产过程中突水事故的发生,保证掘进工作面的安全施工,根据矿井巷道地震波超前探测方法的特点和使用方法,对开滦唐山矿岳胥区掘进工作面中DF11断层及其伴生小断层、裂隙发育区的构造位置和富水性进行超前探测研究,并对水文地质情况进行分析探讨,为巷道设计、支护及矿井防治水提供依据,对岳胥区工程安全施工具有重要指导意义。
【Abstract】 To prevent water inrush incidents in the production process and ensure the safety of heading face construction,according to the characteristics of and the using methods of the advanced detection methods of earthquake wave of mine tunnel,the paper made advanced detection to the DF11 fault in the mining face of Kailuan Tangshan mine Yuexu zone,structural position and watery of associated small faults and fractured zone,analyzed the hydrogeological conditions,which provided basis for roadway design,support and control of water and had important guidance significance for the safety construction.
【Key words】 heading face; seismic waves; hydrogeology; advanced detection;
- 【文献出处】 价值工程 ,Value Engineering , 编辑部邮箱 ,2012年01期
- 【分类号】TD76
- 【被引频次】1
- 【下载频次】51