节点文献

基于极值原理的瞬时单位线法在洪峰求解中的应用研究

Research on the application of the Nash Unit Line method of flood peak calculation based on extreme value principle

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 周斌

【Author】 ZHOU bin;Shanwei Municipal Water Resources and Hydropower Planning and Design Institute of Guangdong Province;

【机构】 广东省汕尾市水利水电规划设计院

【摘要】 工程中采用瞬时单位线法计算洪水时,洪峰均是从有限的计算节点上统计最大值作为洪峰,存在一定误差.当有较高精度要求时,不宜仅统计有限计算节点上的洪水最大值作为设计洪峰.采用瞎子爬山法和半分法计算洪峰流量,算法简洁明晰,计算开销有限,收敛速度快,是优良的计算方法,可供广大设计同行参考使用.

【Abstract】 When the Nash Unit Line method is used to calculate the flood peak in a project,the maximum value of the flood peak is taken as the flood peak from the limited calculation node,and there is a certain error. When higher accuracy is required,it is not appropriate to count only the maximum flood value at the limited calculation node as the design flood peak. The blind mountain-climbing method and the semi-divided method are excellent methods for calculating flood peak flow,which are simple and clear,have limited calculation overhead and fast convergence speed,and can be used by many design colleagues for reference.

  • 【文献出处】 江西水利科技 ,Jiangxi Hydraulic Science & Technology , 编辑部邮箱 ,2019年01期
  • 【分类号】TV122.5
  • 【被引频次】1
  • 【下载频次】45
节点文献中: 

本文链接的文献网络图示:

本文的引文网络