节点文献
模糊综合评判法在隧道岩体含水性预报中的应用
Application of Comprehensive Fuzzy Evaluation Method in Water-bearing Forecast in Tunnel Works
【摘要】 为了综合利用各种超前地质预报方法,得出一个相对正确的结论,提出应用模糊综合评判法进行超前地质预报。结合工程实例,从建立评判集、因素集、求取各因素的相对权重等方面介绍模糊综合评判法在超前地质预报中的应用。通过工程实际应用,证明该方法是可行的。
【Abstract】 It is recommended that comprehensive fuzzy evaluation method should be used in the geology forecast of tunnel works so as to make full use of all kinds of geology forecast methods and draw a relatively correct conclusion.The application of comprehensive fuzzy evaluation method in the geology forecast of tunnel works is presented in terms of the establishment of the factor set and evaluation set and the obtaining of the relative weight of the various factors on basis of engineering cases.The engineering practice verifies that the evaluation method is feasible.
【关键词】 模糊综合评判法;
隧道;
超前地质预报;
岩体含水性;
【Key words】 comprehensive fuzzy evaluation method; tunnel; geology forecast; water-bearing of rock mass;
【Key words】 comprehensive fuzzy evaluation method; tunnel; geology forecast; water-bearing of rock mass;
【基金】 湖南省交通厅科研项目(20080302)
- 【文献出处】 隧道建设 ,Tunnel Construction , 编辑部邮箱 ,2010年03期
- 【分类号】U452.11
- 【被引频次】1
- 【下载频次】71