节点文献

建筑工程深基坑降水方案设计——以江苏省徐塘电厂为例

Design for deep foundation pit dewatering of construction engineering——A case study on Xutang Electric Power Plant in Jiangsu Province

  • 推荐 CAJ下载
  • PDF下载
  • 不支持迅雷等下载工具,请取消加速工具后下载。

【作者】 李友龙董洪信赵中省

【Author】 LI You-long,DONG Hong-xin,ZHAO Zhong-sheng(Exploration Institute of Hydrogeology and Engineering Geology,Jiangsu Province,Huaian 223005,Jiangsu)

【机构】 江苏省水文地质工程地质勘察院

【摘要】 深基坑降水是确保地质工程安全的重要工程技术措施。以江苏省徐塘电厂翻车机室基坑降水方案确定为例,论述了建筑工程深基坑降水方案设计方法,得到了疏干降水量以及降水井数量。通过徐塘电厂翻车机室基坑降水工程实践,效果显著,可为条件类似地区工程建设提供技术参考。

【Abstract】 The application of the deep foundation pit dewatering engineering is an important technique to make sure of the construction safety under complex geologic conditions.Combining with the deep foundation pit dewatering projects in tipper room of Xutang in Jiangsu Province,the authors focused on the foundation pit dewatering project,obtained the dewatering volume and wells.It was concluded that the project in Xutang was accomplished with a good protecting and economical effect,providing a basis and reference for solving the dewatering problems with similar conditions.

  • 【文献出处】 地质学刊 ,Journal of Geology , 编辑部邮箱 ,2011年01期
  • 【分类号】TU753.66
  • 【被引频次】7
  • 【下载频次】164
节点文献中: 

本文链接的文献网络图示:

本文的引文网络